Technology shapes our daily lives as people seek faster, easier, and budget-friendly solutions, including in construction. The beam and block slab system is emerging as the safest, most efficient, and cost-effective method, as our client in Juja discovered.

Ecoconcrete Beam and Block System was specified by our client in Juja for the first floor and roof slab as it met all the requirements

Project details

The project consisted of a first-floor slab and the roof slab. for the first floor slab, the slab area was 139m² and the roof slab was also 139m². The residential development project is located at Kenyatta Road – Mundani Estate in Juja. a few kilometres before you get to Thika.

Client’s requirement

In this case, the client’s requirements were minimal. However, they needed a fast, easy-to-install, and cost-effective slab system to complete the project on time. Fortunately, our slab system was the perfect solution.

Site visit

After finalizing agreements, our engineers visited the site for evaluation and dimension confirmation, ensuring accuracy and efficiency.

Upon arrival, they found wall construction already in progress above the ground floor. This made value engineering crucial to assess the structural integrity of the walls and foundation, ensuring they could support the first floor and roof slab.

Our priority was to guarantee the client received the best value and top-quality service when using our products.

Fast and easy installation using Ecoconcrete beam and block system.

On installation day, the team got to work immediately, placing all beams with precision to meet high standards. With the beams in place, they swiftly installed the pre-unloaded lightweight infill blocks, completing the process on schedule.

Afterward, they installed conduits and applied the screed. Our quotations always include the correct number of beams and blocks, ensuring a seamless installation.

The team completed the job without delays, and the floor fit perfectly. Now, the site is ready for the next construction phase. We plan to use the beam and block slab system for the roof slab, designed to support extra loading from water tanks.