When tackling a recent project involving the construction of a mansion, we turned to the Beam and Block flooring system to optimize efficiency and cost-effectiveness. This case study focuses on two significant advantages of the Beam and Block system: the elimination of formwork and propping. These features not only streamline the construction process but also yield substantial cost savings.http://Learn more about the Beam and Block flooring system

No Formwork: A Self-Supporting System

Precast Beams run from ring beam to ring beam, therefore formwork is not needed.  Traditional construction methods typically rely on formwork to mold and support wet concrete until it cures. This process is both labor-intensive and costly. For our project, which covered a 100-square-meter area, the savings from not using formwork were considerable.

Cost Savings with Beam and Block

In traditional construction, the cost of formwork can range from 700kshs to 1300kshs per square meter. For our 100-square-meter project, this would have amounted to 70,000kshs to 130,000kshs solely for formwork. By using the Beam and Block system, we avoided these expenses entirely. The self-supporting nature of this system means that once the beams and blocks are in place, they provide immediate stability without the need for additional support structures.

Moreover, eliminating the need for formwork significantly reduces labor costs and project timelines. In our experience, the time saved by bypassing the installation and removal of formwork allowed us to complete the project more quickly and efficiently, translating into further cost reductions and increased productivity, Understand the cost-effectiveness of Beam and Block systems

No Propping: Simplifying Construction and Enhancing Safety

Propping is another traditional construction requirement that the Beam and Block slab system eliminates. Propping involves supporting the structure temporarily to ensure stability during construction until the concrete cures. This process requires additional materials, labor, and time, which can complicate the construction process.

Beam and Block: A Propping-Free Alternative

With the Beam and Block system, there is no need for propping. Once the beams and blocks are installed, they provide immediate structural stability. This feature not only simplifies the construction process but also enhances safety on the job site. In our project, the absence of propping meant there were fewer risks of accidents or structural failures during construction.

For a 100-square-meter area, the cost of propping in conventional slabs can range from 600kshs per square meter, adding an extra 60,000kshs to the project budget. By eliminating this requirement, the Beam and Block system offers substantial cost savings. Additionally, without the need for propping, there is no need for ongoing inspections and adjustments, which further reduces costs and streamlines the construction process.

Project Success with Beam and Block

In our recent project, the decision to use the Beam and Block flooring system proved to be highly advantageous. The elimination of formwork and propping resulted in significant cost savings and a more efficient construction process. For a 100-square-meter area, we saved approximately 200,000kshs by avoiding the costs associated with traditional formwork and propping. These savings allowed us to allocate resources more effectively and complete the project ahead of schedule.

By leveraging the advantages of the Beam and Block system, our project not only achieved faster, safer, and more cost-effective outcomes but also set a new standard for future construction endeavors. The innovative approach of no formwork and no propping is poised to revolutionize the industry, offering tangible benefits that translate into real-world savings and efficiency gains.

http://Read about the durability and strength of Beam and Block systemsThe Perfect Fit for Staged Construction

In conclusion, the Beam and Block flooring system provided an optimal solution for the project, demonstrating the significant advantages of no formwork and no propping. This case study highlights the practical and financial benefits of this innovative system, making it a compelling choice for modern construction projects.