Beam & Block
What is a Beam & Block floor?
There are two types of concrete floor system commonly used in modern construction; ground bearing and suspended. Historically in Kenya we have used ground bearing, poured concrete slab. Beam & Block is a type of suspended concrete floor which is very common in more developed markets.
The suspended floor does not rely on support from the ground below but instead is supported by the external walls, and therefore the foundations below.

The beam and block floor system is fast becoming a popular form of domestic & commercial floor construction. It is an economical option due to off site manufacture of the beams and blocks, fast assembly and little requirement for specialist labour or equipment. The installation of a beam and block floor is not usually weather dependent and therefore specifying this form of construction can reduce site delays that other methods might encounter. Beam and block flooring demonstrates good noise reduction and fire resisting properties, and is also suitable to host underfloor heating systems.

The precast concrete inverted T-beams are supported by the perimeter walls and internal load bearing walls. The beams vary in depth, and are 150mm or 225mm in depth, cast up to lengths up to 6m, they are designed and cast to fit your design. Beam depth and profiles are selected according to span and loading requirements, along with the type of block specified.
Infill blocks are then positioned between the T-beams, these blocks are usually lightweight concrete. A sand cement grout is brushed over the surface, filling any gaps providing a good load distribution and avoiding movement in the blocks. The grout also keeps insects and vermin out and assists with air tightness.








Our Working Process
Consultation
Firstly we will review your project and give you Free Value Engineering, making any recommendations you may need.
Quotation
Secondly once the Architect has done with your design, we will require either the drawings to enable us to give you a quote for the floor.
PRODUCTION
When that’s agreeable then the process can begin. We will cast your bespoke Beams, having first confirmed the measurements on site.
Installation
As soon as you are ready will deliver to site the Beam & Blocks for your floor. One of team will come to oversee the installation for free.
Advantages of Beam & Block
- Preliminaries: Beam and Block allows massive savings on preliminaries as there are savings on storage, security, space, time and labor.
- No Shuttering / Formwork Required: The Beam and Block system is a precast and designed product and does not require formwork for the soffit as does conventional slabs .This saves on costs.
- No Reinforcement Required: The Beams are made of Class 60 concrete, pre-stressed with high tensile steel, and manufactured to BS EN 15037, meaning there no need for additional reinforcement. This makes Beam and Block flooring economical.
- Reduction in Concrete Works: A 50mm to 75mm Fibre reinforced Screed or topping is required only.
- Fast and Easy Installation: The Beam and Block system is very quick and easy to install. Approximately 100 m2 of the system can be installed manually in a day. For conventional slab, it takes about 28 days for the slab to be completed from concreting, vibrating and curing. This can save about 90% of time. Minimal machinery is required on site. (No Concrete pump, No Poker Vibrator, No raking or levelling required).
- All Weather Construction: Installation can begin on delivery and is not influenced by weather conditions.
- Minimal Labour / Machinery required: A competent site supervisor and a few unskilled labour are required to install the system. This saves on costs. The beams can be carried and placed by hand, no lifting equipment required.
- Reduced Theft / loss of Materials from site: The Beam and Block system is uniquely designed for each build, it cannot be used on another site. It is stored in the open. The risk of theft / loss is minimal compared to steel and cement etc. as used in a conventional slab.
- Minimum Site Preparation for ground floor foundation: Only excavation of trenches for foundation walling or columns is required. No removal, cartage and fill and compaction of the ground floor slab as Beam and block is suspended. A minimum Void of 150mm (or 225mm in Black cotton) is required between underside of floor and ground surface. Saving costs and reducing site activity.
- Early working Platforms and quick progression of works: The floor itself becomes a working platform as soon as it is laid, allowing other works and walling to continue as soon as it is laid. Plumbing and electrical can be done upon completion of the structure saving time.
Need A Free Quote?
Contact us today for a free consultation including, free value engineering and quotation for your project.